Confirm locally: The answer depends on the exact address, adopted code, local amendments, project scope and separate approvals. Contact the authority having jurisdiction before ordering materials, demolishing, excavating or beginning work.

Official starting point

Primary authority: Atlanta Office of Buildings

Atlanta projects may require zoning, building, arborist, watershed and historic reviews.

Open the official Atlanta permit starting point

Confirm that this authority serves the address

A Atlanta mailing address may not prove that the property is inside the same permit jurisdiction. Confirm city limits, county status, parcel jurisdiction and any special district before selecting forms or paying fees.

Approval streams to ask about

  • Zoning, planning or land-use clearance
  • Building plan review and permit
  • Electrical, plumbing, mechanical and fuel-gas permits
  • Floodplain, drainage, grading or stormwater review
  • Historic district, tree or environmental approval
  • Driveway, sidewalk, alley or right-of-way permits
  • Fire, health, septic, well or utility approvals where relevant

Project information to have ready

  • Exact street address and parcel number
  • Property type and current legal use
  • Complete written scope, including concealed trade work
  • Existing and proposed dimensions
  • Survey or site plan when exterior work is involved
  • Contractor and design-professional information

Questions to ask Atlanta Office of Buildings

  1. Which permit pathway fits the complete project?
  2. Does zoning approval come before building review?
  3. What work may use an express or over-the-counter process?
  4. Which drawings must be sealed by a licensed professional?
  5. Which contractors must be licensed or registered locally?
  6. How are revisions submitted after permit issuance?
  7. Which inspections are required, and how is final closure documented?

Do not rely on fixed fees or timelines

Fees, review queues, portal procedures and code editions can change. Use the current official fee schedule and application instructions. A page saying that a project is eligible for expedited review does not guarantee approval or a specific completion date.

Official starting points

External official pages can change. Confirm the current page, forms and instructions before acting.